Need three phase power installation in Tampa Bay? Keywest Lights & Electric installs three-phase service, panels and equipment circuits across Pinellas, Hillsborough and Pasco counties. We are a woman-owned contractor under license EC13014717, and we coordinate load calculations, the power company and inspection so your machines run properly.
Request three phase power installation in Tampa Bay
Tell us what you need and where the work is. A licensed electrician will reply with next steps and a time to visit.
Call or text (727) 476-7079 · open 24/7 for emergencies · request a quote online

Three phase power installation in Tampa Bay: power for serious equipment
Three-phase power sends current through three wires that reach their highest point at different moments. The result is smooth, efficient power for large motors, compressors, kitchen gear and machine tools. Many small buildings only have single-phase service. Adding three-phase may need a new transformer, a new service and new panels.
Equipment that wants three-phase
- Large air conditioners: rooftop units and chillers.
- Compressors and pumps: shop air and water systems.
- Commercial kitchens: ovens, dishwashers and hoods.
- Machine tools: lathes, mills and saws.
- Welders and CNC gear: steady current and balanced load.
- Elevators and lifts: motors that need smooth power.
Do you need it?
- Florida electrical contractor license EC13014717, licensed & insured
- Woman-owned business based at 6248 Seminole Blvd, Seminole FL 33772
- 2-year workmanship warranty, 5 years with a Member Care Plan
- SPAN Authorized Installer and Home Depot preferred contractor
- Open 24/7 for electrical emergencies: call or text (727) 476-7079
Check the equipment nameplate. If it says three-phase, with voltages like 208, 240 or 480, the machine needs three-phase supply. Some machines can use a phase converter, but converters have limits. We help you decide between new service and a converter.
Checking what is available
Not every street has three-phase lines. The power company decides whether it can serve a site, and what the transformer and drop need to be. We contact them, share the load list and request a plan. Timing and cost depend on their work.
Load calculation
We list every machine, light and outlet, then apply the code factors. The result tells us the service size, the main breaker and the feeder. We also plan balanced loads across the three phases.
Service entrance equipment
A three-phase service includes a meter base, a main disconnect and a panel or switchboard. Sizes vary with voltage and amps. We select equipment with the right short-circuit rating and room to grow.
Wiring and conduit
Three-phase feeders use three hot conductors, a neutral where needed and a ground. Conduit size and wire gauge depend on amps and distance. We route conduits to avoid heat and damage and label conductors by phase.
Motor circuits and controls
Each motor needs a disconnect, a starter and overload protection. Variable frequency drives control speed and save energy. We wire these devices and set them up according to the maker’s manual.
Phase rotation and balance
If phases are connected in the wrong order, motors spin backwards. We test rotation before connecting equipment. We also measure current on each phase to confirm balance.
Safety and lockout
Three-phase gear carries high current. We lock out circuits before work, test for voltage and use insulated tools. Staff are kept clear of the work area.
Permits and inspections
New service and large equipment need permits and drawings. We prepare the documents, schedule the power company and inspector and keep your timeline in view. Our workmanship carries a 2-year warranty, or 5 years with the Member Care Plan.
Why choose Keywest Lights & Electric
We are licensed, insured and woman-owned. We explain the choices, coordinate every party and keep your downtime short. Call or text (727) 476-7079.
What to send us
Send equipment nameplates, a site address, a floor plan and a list of hours when work will cause the least disruption. We take it from there.
Phase converters and alternatives
When new service is not possible, rotary or digital phase converters can run some machines from single-phase power. They have limits for size and sensitive controls. We tell you honestly if this will work.
Delta, wye and high-leg systems
Three-phase service comes in different arrangements. A wye system has a neutral that supports 120-volt loads. A delta system may have a high leg that must be marked with orange tape and never used for ordinary outlets. We identify the system before connecting anything.
Transformers, pads and clearances
When the power company installs a pad-mounted transformer, it needs clear space, bollards and access. We plan the pad position, conduit stubs and trench path ahead of time and coordinate the delivery of the transformer.
Surge protection and power quality
Sensitive controls can suffer from sags, spikes and phase loss. A surge device at the main and a phase monitor at the motor panel protect equipment. We recommend them when loads include drives and electronics.
Grounding and bonding at the service
A three-phase service needs grounding electrodes, bonding jumpers and sometimes ground-fault protection on the main. We install and test each part, then record the results.
Conduit sizes, pull boxes and bends
Large conductors need big conduit, with limits on bends and pull lengths. We add pull boxes where needed, use proper lubricants and keep minimum bend radii. These steps protect the insulation during the pull.
Variable frequency drives and harmonics
Drives make electrical noise. Long motor leads, shielded cable and line reactors keep it in check. We follow the drive maker’s guidance and test for nuisance trips.
Emergency stops and safety circuits
Machines need emergency stop buttons, guards and interlocks. We wire the safety circuit as the maker shows, test every stop and label each button.
Cranes, hoists and lifts
Overhead cranes and hoists use three-phase motors, festoon cable and limit switches. We run feeds and disconnects, test limit switches and confirm the brake releases.
Meter sockets, CT cabinets and metering
Larger services use current transformers in a metering cabinet instead of a plain socket. The power company sets the rules for the cabinet model, the conduit and the test switch. We follow their sheet and mount the cabinet where crews can reach it.
Common questions
How do I know if I need three-phase? Check equipment nameplates. They list the phase and voltage.
Can you bring three-phase to my building? It depends on the lines available. We ask the power company.
Can I use a phase converter? For some machines, yes. We assess the load and the equipment.
Do you size the service? Yes, with a load calculation.
Do you wire motors and drives? Yes.
Do you handle permits? Yes.
Will I lose power during the work? For a short time. We plan it with you.
Do you serve my area? We serve Pinellas, Hillsborough and Pasco counties. Call or text (727) 476-7079 to confirm.
Local pages: three phase power installation in Seminole, our home base. See also Pinellas County, Hillsborough County and Pasco County service areas, or browse all electrical services.
Call or text (727) 476-7079 for three phase power installation in Tampa Bay, or book online. Business hours 7 AM–5 PM, weekend service, 24/7 emergency calls.
